top of page


Barlcays Center
Work performed: Concrete on Metal Deck, Column Encasements, CIP stairs, metal pan stairs, aisle steps, topping slabs, walls, curbs, pads, overbuilds, ice rink slab, ConEd Vault
![]() Barclays Center | ![]() Foundation | ![]() Foundation Slabs |
---|---|---|
![]() Foundation | ![]() Foundation & Safety | ![]() Rebar on metal deck foundation |
![]() Concrete foundational pour | ![]() Stadium Concrete Steps | ![]() Stadium Concrete Stair Seating |
![]() Foundation concrete pour | ![]() Osha protection | ![]() |
![]() | ![]() |
Externally, the arena’s basic shape is that of three articulated bands, and features a glass curtain wall covered by a “latticework” made up of 12,000 preweathered steel panels, which are meant to evoke the image of Brooklyn’s brownstones. An 117-by-56-foot “Oculus” extends over a 5,660-square-foot section of the plaza outside of the main arena entrance, and contains an irregularly-shaped display screen that loops around on the inside of the structure.
bottom of page